Lern by experience a hugh part of IT Service problems can be traced back to changes. Changes of the IT infrastructure ever involve other Problems whose elemination is high beyond actual modification effort.
For the change transaction the Change Management is seperate in Request for Change, Change and Forward Schedule of Changes.
Request for Changes will be evaluated in matters of possible effects, their urgency, their costs and their benefit. Afterwarts the changes will be prioritizes and enabled. A RfC describe a Request for Change on the system (at one or more configuration items).
Table: Actions and icons at the RfC Pool
<note important> Attention: If the flag “isPrivate” is checked only a user owned the right Change.Manage, the RfC owner or who has created the RfC (or rather be released by or the person in charge) can look at the RfC. Additional, the logged user need the right RfC.Display.Pool to look at the list.</note>
Example:
The search contains the following criteria
Please click on the title of the searched RfC to open it in the detail view.
A new mask display where you can choose the change categoy and if needed a change template. The saved date (title, desciption, edited by) out of a template will be automatically assumed into the RfC:
[explain category]
<note tip>With selection of a template of the change category “Kat0” the following should be paid: A Kat0 change template got a special treatment and after his creation the RfC, Change and FSC will be automatically set on status “completed”.</note>
Please select a category and choose the template you want. After that click on <font color="darkorange"><b>Select</b></font>.
The fields at the RfC in detail:
Notify person in charge
Here is an option for overdue tasks after you checked the checkbox “send message for every task”. It works as described below:
Pleas click on save or save and push back to pool to save the Request for Change. Your Request for Change receive automatically the status scheduled.
Choose if the person in charge
After the RfC has been saved you can add a task:
As soon as the RfC is created you can click on Add on the bottom of the mask in the task management part:
Description of the fields:
Please click on save to save your entries and tasks.
View: example for a RfC task
A task can only be completed by the person of charge of the task in the assigned Forward Schedule of Change (FSC)
Follow the next steps to open the FSC of the RfC:
1) Please click on the Change ID at the navigation bar of the RfC:

The associated Change will be open in a new window.
2) Afterwards change to the FSC detail view by clicking on the FSC ID, it will appear in a new window:

Inside the FSC will be displayed the Task Management panel. To edit a task click on the edit symbol
on the right site beside the task. The detail mask of the task opens.

By clicking on the xxx symbol
the task can be completed (A) and a additional comment can be entered (B):
A)

B)

When addtional changes on the CI has been made the status of the task change to CI synchronised - completed.
Validation view for the completed tasks in the FSC history at the bottom of the screen:

The RfC status will change in agreement with the Change-workflow (see below). The status which can be assign to a RfC is addicted of the current active status and specific information of each RfC.
The status can be changed in RfC detail view.
Only user assigned the right RfC.Manage can approve a RfC. In addition for each Change category can be set if the creator of the RfC can approve the RfC too (releaseByOwner flag in tbChangeCategory).
After approve aFSC and a RfC can be creted out of the Change. By clicking on the
symbol a person in charge of the change can be choosed and a change created:

The fields Title, Description, Start/End date will be assumed to the change.
The change can be selected by clicking on the change id link:

A new window open where you can change the Change data and throught the symbol
be approved.
After that a new panel open where you can apply a new Forward Schedule of Change:

After choosing a person in charge for the FSC with
a FSC will be created. The FSC ID will be displayed in the Change:

By clicking on the FSC ID the FSC data open in a new window and can be edit in this window.
To complete a RfC all associated tasks and alternatively all associated FSC has to be completed and the RfC is in status PIR (Post Implementation Review). By clicking on the get redy symbol
the RfC get the status “completed”:

Only the creator or a user include the right RfC.Manage be able to archive a RfC. To close and archive a RfC click on
please.

The RfC is finally closed and in status archive as you can see in the pool too.

Through the symbol
you can add a existing change to a enabled RfC:

Choose the Change you want out of the list and click on the
:

The linked RfCs will be displayed at the Change detailview in the panel Request for Changes. To receive the following view click on the Change ID:

RfC's in status cheduled can be escalated. All users with the right RfC.Manage will achieve an escalation mail. The range of time for the escaltion is set in the Database table tbGlobalSetting in the field escalationRfCThreshold in minutes.
A change describe and arrange the action for a change at the system (one or more CIs). An overview of all can be called through the mainmenu.
Have a closer look to this.
At the Change detailview you can add to the existing Change a enabled RfC. Please, click on Add on the left above:

All current enabled RfCs will be displayed. Please choose the RfC you want by clicking on
:

To remove a added RfC click on
on the left side:
You can enable a Change in status scheduled as followed:
Please use the push-button at the panel.
After the enable you have to choose a person in charge for the FSC. You can only create a new FSC from the system:

Forward Schedule of Changes (FSC) is a task collection for executing a change.
The search occour after the following criteria:
Der Forward Schedule of Changes (FSC)-Status ändert sich in Übereinstimmung mit dem FSC-Workflow. Das heißt, die Status, die einem FSC zugewiesen werden können, sind abhängig vom aktuellen Status und den Daten, die im FSC ausgefüllt sind. Der Status des FSC kann in der FSC-Detailmaske verändert werden.

Der Status freigegeben wird während der Erzeugung eines neuen FSC aus einem freigegebenen Change automatisch gesetzt.
Der Benutzer setzt den Status des FSC durch Klicken auf
auf den Status fehlgeschlagen. Dies kann nur gesetzt werden wenn kein Task erledigt ist.
Der Benutzer setzt den Status des FSC durch Klicken auf
auf den Status fertiggestellt. Dies kann nur gesetzt werden wenn auch alle einzelnen Tasks erledigt sind.
Um eine bereits vorhandene Vorlage zu ändern, klicken Sie bitte auf die entsprechende Vorlage:

Beispiel:

Nun können die Änderungen vorgenommen werden:

Klicken Sie bitte abschließend auf Speichern, um Ihre Eingaben zu sichern.
Um eine neue Vorlage zu erstellen, wählen Sie bitte zunächst die gewünschte Change-Kategorie aus. Es erscheint sodann das
Symbol.
Beispiel:

Klicken Sie anschließend auf
und es erscheint folgende Eingabemaske:

Beim Speichern wird eine neue Vorlage mit dem eingetragenen Namen erstellt.
Für eine Vorlage können beliebige Tasks hinterlegt werden (siehe unten).
<note tip> Ein Release ist die Zusammenfassung der RfCs und Changes und legt somit den Umfang einer Veröffentlichung fest. Der Status eines Release kann entweder direkt in der Release-Detailmaske oder dem Release Pool gesetzt werden.</note>
1. Aus dem Hauptmenü legt der Benutzer einen neuen Release an
2. Benutzer gibt die Daten ein
3. Benutzer speichert die Änderungen und Release wird im Status „geplant“ angelegt
4. Anwendungsfall ist beendet
1. In dem Panel “Release verwalten“ fügt der Benutzer einen RfC oder Change mit Hilfe der Schaltfläche „RfC/Change hinzufügen“ zu dem abgespeicherten Release im Status „geplant“ hinzu
2. Ein Panel mit Suchfilter (Status, ID, Titel) wird eingeblendet, der Benutzer wählt Filtereinstellungen und sucht nach RfC/Change
3. Benutzer fügt gefundenen RfC/Change zu dem Release hinzu
4. Tabelle mit allen hinzugefügten Elementen (RfCs/Changes) wird angezeigt
5. Anwendungsfall ist beendet
1. Mit Hilfe der Schaltfläche „RfC/Change entfernen“ entfernt der Benutzer einen RfC oder Change, der sich in der Tabelle befindet, die sich in dem Panel „Release verwalten“ eines Release im Status „geplant“ befindet.
2. Benutzer bestätigt (oder bricht ab) eine Bestätigungsaufforderung
3. RfC/Change wird aus dem ausgewählten Release entfernt
4. Anwendungsfall ist beendet
1. In der RfC-/Changedetailmaske betätigt der Benutzer die Schaltfläche des übergeordneten Release
2. Release-Detailmaske wird in einen neun Fenster angezeigt
3. Anwendungsfall ist beendet
1. Ein neues Release wird erzeugt im Status „geplant“
2. Anwendungsfall ist beendet
1. Benutzer klickt auf Schaltfläche „Release freigeben“
2. Release wird für die weitere Bearbeitung gesperrt
3. Anwendungsfall ist beendet
1. Benutzer klickt auf Schaftfläche „QA“
2. Release wird auf Status „QA“ gesetzt. Weitere Änderungen an Release sind möglich
3. Anwendungsfall ist beendet
1. Benutzer klickt auf Schaltfläche „Release löschen“ eines der angezeigten Release in den Release Pool oder in der Release-Detailmaske
2. Benutzer bestätigt (oder bricht ab) eine Bestätigungsaufforderung
3. Release wird auf Status „gelöscht“ gesetzt
4. Anwendungsfall ist beendet
<note tip> Fremdschlüssel in RfCs/Changes müssen auf NULL gesetzt werden, bevor die eigentliche Löschung des Release erfolgt. Das hat zur Folge, dass es unmöglich sein wird, nach einer Löschung des Release festzustellen, welche RfCs/Changes mit dem Release verknüpft gewesen sind.</note>